中文字幕网伦射乱中文-超清中文乱码字幕在线观看-亚洲v国产v欧美v久久久久久-久久性网-手机在线成人av-成人六区-国产人与zoxxxx另类一一-青青草国产久久精品-蜜桃av久久久一区二区三区麻豆-成人av一区二区免费播放-在线视频麻豆-www爱爱-成人免费看片视频-性欧美老肥妇喷水-五月99久久婷婷国产综合亚洲-亚洲最色-各种含道具高h调教1v1男男-91丨porny丨国产-国产精品无码专区在线观看不卡-大香伊人

Africa  

Sudan regrets Egypt's accusation of contributing to Nile dam talks failure

Source: Xinhua   2018-05-09 21:31:59

KHARTOUM, May 9 (Xinhua) -- Sudan on Wednesday expressed regret over Egypt's official statement blaming Sudan and Ethiopia for failure of the recent tripartite talks on the Grand Ethiopian Renaissance Dam (GERD).

"The Sudanese Ministry of Water Resources, Irrigation and Electricity expresses regret over statements made by Egyptian Foreign Minister Sameh Shoukry, which contradict the positive spirit between the two countries," said the Sudanese ministry in a statement.

On Monday, Shoukry reportedly blamed Sudan and Ethiopia for the failure of the recent round of the tripartite dam talks held in Ethiopia, accusing Sudan of narrowing the view points of the meeting.

The talk ended on May 5 without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

"Sudan has provided a comprehensive consensus proposal that the three countries agreed to look into and respond within a week and consider possibility of using it as a course to get out of the current technical crisis," the statement said.

It further stressed Sudan's firm position on the necessity of making an effort to complete the studies, and continue the talks and meetings.

"Questioning and destroying the bridges of trust will only bring divergence and dispute to the peoples of the three countries," it noted.

The three countries are expected to meet again in Addis Ababa in Ethiopia on May 15 on the same issue.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia rejected the request.

The GERD project, which costs 4.7 billion U.S. dollars, is now 64 percent completed. Ethiopia hopes it will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned that it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

Editor: Yurou
Related News
Home >> Africa            
Xinhuanet

Sudan regrets Egypt's accusation of contributing to Nile dam talks failure

Source: Xinhua 2018-05-09 21:31:59

KHARTOUM, May 9 (Xinhua) -- Sudan on Wednesday expressed regret over Egypt's official statement blaming Sudan and Ethiopia for failure of the recent tripartite talks on the Grand Ethiopian Renaissance Dam (GERD).

"The Sudanese Ministry of Water Resources, Irrigation and Electricity expresses regret over statements made by Egyptian Foreign Minister Sameh Shoukry, which contradict the positive spirit between the two countries," said the Sudanese ministry in a statement.

On Monday, Shoukry reportedly blamed Sudan and Ethiopia for the failure of the recent round of the tripartite dam talks held in Ethiopia, accusing Sudan of narrowing the view points of the meeting.

The talk ended on May 5 without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

"Sudan has provided a comprehensive consensus proposal that the three countries agreed to look into and respond within a week and consider possibility of using it as a course to get out of the current technical crisis," the statement said.

It further stressed Sudan's firm position on the necessity of making an effort to complete the studies, and continue the talks and meetings.

"Questioning and destroying the bridges of trust will only bring divergence and dispute to the peoples of the three countries," it noted.

The three countries are expected to meet again in Addis Ababa in Ethiopia on May 15 on the same issue.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia rejected the request.

The GERD project, which costs 4.7 billion U.S. dollars, is now 64 percent completed. Ethiopia hopes it will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned that it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

[Editor: huaxia]
010020070750000000000000011100001371673191