"/>

中文字幕网伦射乱中文-超清中文乱码字幕在线观看-亚洲v国产v欧美v久久久久久-久久性网-手机在线成人av-成人六区-国产人与zoxxxx另类一一-青青草国产久久精品-蜜桃av久久久一区二区三区麻豆-成人av一区二区免费播放-在线视频麻豆-www爱爱-成人免费看片视频-性欧美老肥妇喷水-五月99久久婷婷国产综合亚洲-亚洲最色-各种含道具高h调教1v1男男-91丨porny丨国产-国产精品无码专区在线观看不卡-大香伊人

Thai authorities warn of dam spillover, flood in western province
Source: Xinhua   2018-08-06 19:42:02

BANGKOK, Aug. 6 (Xinhua) -- Thai authorities on Monday warned residents in western Thailand against water runoffs from a dam in Petchburi Province bordering Myanmar.

The Phetchaburi Irrigation Department said the Kaeng Krachan Dam had already received up to 708 million cubic meters of water till Monday, or 99.7 percent of its capacity.

Phetchaburi's five districts downstream from Kaeng Krachan Dam are warned of further flooding due to water discharge from the dam.

The department said that municipal area will come under water about 25-30 cm deep and flow downstream to the Ban Laem district.

The Crisis Ad Hoc Center has dispatched 20 water-pushing boats to pump water from the Khlong D Canal into the sea.

Since Saturday night, hundreds of residents were seen filling sacks of sand to place them in front of their houses to fend off flood water.

The ad hoc center was also preparing to evacuate residents to higher grounds.

The Kaeng Krachan Dam, a multi-purpose dam built in 1966, stands at 760 meters long and 58 meters high.

Disaster Prevention and Mitigation Department chief Chayapol Thitisak said on Monday that nine provinces in the northeastern region were still affected by flooding as a result of heavy rain and overflow from the Mekong River.

"With the monsoonal rain, we have seen 100,000 people affected by flood and landslides in 27 provinces in just two weeks," said Chayapol. "It will take at least two months for flood water to recede."

Editor: zh
Related News
Xinhuanet

Thai authorities warn of dam spillover, flood in western province

Source: Xinhua 2018-08-06 19:42:02
[Editor: huaxia]

BANGKOK, Aug. 6 (Xinhua) -- Thai authorities on Monday warned residents in western Thailand against water runoffs from a dam in Petchburi Province bordering Myanmar.

The Phetchaburi Irrigation Department said the Kaeng Krachan Dam had already received up to 708 million cubic meters of water till Monday, or 99.7 percent of its capacity.

Phetchaburi's five districts downstream from Kaeng Krachan Dam are warned of further flooding due to water discharge from the dam.

The department said that municipal area will come under water about 25-30 cm deep and flow downstream to the Ban Laem district.

The Crisis Ad Hoc Center has dispatched 20 water-pushing boats to pump water from the Khlong D Canal into the sea.

Since Saturday night, hundreds of residents were seen filling sacks of sand to place them in front of their houses to fend off flood water.

The ad hoc center was also preparing to evacuate residents to higher grounds.

The Kaeng Krachan Dam, a multi-purpose dam built in 1966, stands at 760 meters long and 58 meters high.

Disaster Prevention and Mitigation Department chief Chayapol Thitisak said on Monday that nine provinces in the northeastern region were still affected by flooding as a result of heavy rain and overflow from the Mekong River.

"With the monsoonal rain, we have seen 100,000 people affected by flood and landslides in 27 provinces in just two weeks," said Chayapol. "It will take at least two months for flood water to recede."

[Editor: huaxia]
010020070750000000000000011100001373717041